Resource Recycling
  • The Latest
  • Analysis
    • All
    • Certification Scorecard
    • Industry Announcements
    • Opinion
    Northeast commodity values for Q2 reach 2-year high

    Will a MRF shortage limit EPR growth?

    From claims to custody: PCR procurement grows up

    Certification scorecard — week of September 7

    iFixit launches 2-week circuit board training course

    Printed circuit board (PCB) recycling explained

    Sims: Parts reuse helped offset 2020 cloud challenges

    ITAD providers should choose their data-center niche

    Dell expects PC refresh to extend into next year

    Dell, HP show enterprise PC spending separating from unit volume

    Update of e-Stewards to be released for comment

    Certification scorecard for the week of Aug. 31

  • Conferences
    • Resource Recycling Conference
    • Plastics Recycling Conference
    • E-Scrap: The Longevity Conference
    • Textiles Recovery Summit
  • Publications
    • E-Scrap News
    • Plastics Recycling Update
    • Policy Now
    • Resource Recycling
    • Other Topics
      • All Topics
      • Brand Owners
      • Critical Minerals
      • Glass
      • Grant Watch / RFPs
      • Markets
      • Organics
      • Packaging
      • Research
      • Technology
      • Textiles
Subscribe
No Result
View All Result
Resource Recycling
  • The Latest
  • Analysis
    • All
    • Certification Scorecard
    • Industry Announcements
    • Opinion
    Northeast commodity values for Q2 reach 2-year high

    Will a MRF shortage limit EPR growth?

    From claims to custody: PCR procurement grows up

    Certification scorecard — week of September 7

    iFixit launches 2-week circuit board training course

    Printed circuit board (PCB) recycling explained

    Sims: Parts reuse helped offset 2020 cloud challenges

    ITAD providers should choose their data-center niche

    Dell expects PC refresh to extend into next year

    Dell, HP show enterprise PC spending separating from unit volume

    Update of e-Stewards to be released for comment

    Certification scorecard for the week of Aug. 31

  • Conferences
    • Resource Recycling Conference
    • Plastics Recycling Conference
    • E-Scrap: The Longevity Conference
    • Textiles Recovery Summit
  • Publications
    • E-Scrap News
    • Plastics Recycling Update
    • Policy Now
    • Resource Recycling
    • Other Topics
      • All Topics
      • Brand Owners
      • Critical Minerals
      • Glass
      • Grant Watch / RFPs
      • Markets
      • Organics
      • Packaging
      • Research
      • Technology
      • Textiles
Subscribe
No Result
View All Result
Resource Recycling
No Result
View All Result
Home Resource Recycling Magazine

Facility Focus: Area Recycling, Inc.

byJared Paben
April 13, 2020
in Resource Recycling Magazine

With material buyers today paying less for recyclables but demanding higher quality, some recycling companies have cut back or closed.

Peoria Disposal Company (PDC), however, has rolled with the punches – and hit back with a multi-million-dollar upgrade to its Pekin, Ill. materials recovery facility.

“We made this sizeable investment because we know the recycling industry will survive this downturn,” said Matt Coulter, vice president of Peoria Disposal Company (PDC). “Adapting to changing markets and creating a better end product is our vision realized.”

Area Recycling (a PDC-owned company) and its affiliates have over 60 municipal contracts. Under those deals, 50,000 households have their recyclables taken to the single-stream MRF in Pekin, which is located in central Illinois about 170 miles southwest of Chicago.

The 50,000-square-foot facility was originally acquired by Area Recycling when it purchased the local assets of Midland Davis Corporation in 2015.

Facing challenging markets, Area Recycling invested $3.5 million into retooling the MRF with equipment from Quebec-based recycling equipment supplier Machinex. After a two-month construction and installation period, the MRF had a grand re-opening in June 2019. The new single-stream system is capable of processing 12 tons per hour, but it can easily be upgraded to handle 18 tons per hour, according to Machinex.

At the time of acquisition in 2015, the MRF could sort about 500 tons per month, but today the MRF is processing over 2,000 tons per month. Additionally, the upgrade reduced the weight of residue heading to landfill by about 80%.

As part of the project, Machinex installed a MACH Triple Deck OCC screen and a MACH Ballistic Separator, which separates 2D from 3D materials but with lower maintenance requirements than a traditional disc screen, according to Machinex. That’s because the ballistic unit has no exposed shafts for materials to get wrapped around, and it doesn’t use rubber discs, eliminating the need to replace worn discs.

The upgrade also improved metals recovery by way of a new overbelt magnet and Machinex eddy current separator.

As part of the project, Area Recycling also expanded the facility’s tipping floor by 8,000 square feet.

“The recycling industry is at a critical point in its history and the value of recycling material is at a historic low,” PDC’s Coulter noted. “This new sort system produces a purer recycled commodity and it does it four times as fast as the old equipment. Adding value to our end product is one way to reinvigorate recycling.”

About 70% of the material coming out of the system is fiber. Containers, meanwhile, make up 10% of the stream. And the remaining 20% is residue.

Even before the major upgrade last year, the MRF included a unique piece of equipment meant to reduce the risk of catastrophic fires: a Fire Rover system. Installed in 2018, the system uses sensors to detect hot spots, which can indicate a smoldering fire. A remote-controlled hose douses the spot with water, putting out any fire before it’s able to grow into a MRF-consuming conflagration.

Like all MRFs, the facility still has its challenges, Coulter noted, including sorting-line impacts from single-use plastic bags, glass, rigid plastics and tanglers such as wire, garden hoses and extension cords.

Area Recycling employs 25 full-time and temporary employees who work a 10-hour shift, Tuesday through Friday.

This article appeared in the March 2020 issue of Resource Recycling. Subscribe today for access to all print content.

Tags: MRFs
TweetShare
Jared Paben

Jared Paben

Related Posts

Northeast commodity values for Q2 reach 2-year high

Will a MRF shortage limit EPR growth?

byKatherine Doerr
September 10, 2026

Where will all the EPR-collected SSR go? Will there be enough MRFs to handle the material?

Mich. sortation project shows shifting MRF role

Mich. sortation project shows shifting MRF role

byAntoinette Smith
August 26, 2026

Kent County's use of AMP sorting tech is part of a broader expansion of recycling recovery architecture.

Facility fires on pace to match 2025

byPaul Lane
July 29, 2026

The mid-year report from Fire Rover found the number of fire incidents remains elevated compared to historical averages.

Reworld reports increased e-scrap volumes

byPaul Lane
June 18, 2026

The New Jersey-based company separated and processed 6,000 tons of metals from discarded electronics at its Philadelphia EcoWorld facility.

WM, Circular Materials announce new Canadian facility

byStefanie Valentic
May 21, 2026

Hauler WM will open a new preconditioning recycling facility (PCF) in Edmonton in early 2027, bringing advanced optical sorting to...

WM opens new $60m MRF in Indy

byAntoinette Smith
April 10, 2026

The newest recycling facility has annual capacity of 200,000 tons and will send all mixed paper to Pratt Industries for...

Load More
Next Post

Data Corner: The influence of hauling giants in the MRF market

2026 Buyers’ Guide

Equipment, services and technology suppliers serving the recycling industry.

Browse the Guide

More Posts

SB 54 Unpacked: Can film catch up to cartons?

September 4, 2026
Analysis: CA climate rules set off ripple effect for thousands

SB 54 Unpacked: California jurisdictions face scramble to comply

September 2, 2026
Lawsuits hover days after SB 54 approval

Preparing for SB 54 design compliance

September 8, 2026
Auto Draft

R3 Lithium launches pioneering mineral processing facility

September 4, 2026
Alpek closing Pennsylvania RPET plant

Alpek seizing on war-related opportunity 

July 27, 2026
Study explores cleanliness of food packaging in bins

SB 54 Unpacked: REMs, reimbursements remain moving targets

September 3, 2026
Bipartisan reps introduce bill on recycling claims

House subcommittee advances PACK Act

September 1, 2026
Live selling presents pathway to ITAD sales

Live selling presents pathway to ITAD sales

September 3, 2026
Sims: Parts reuse helped offset 2020 cloud challenges

ITAD providers should choose their data-center niche

September 8, 2026
Bale pricing mostly flat for September

Bale pricing mostly flat for September

September 9, 2026
Load More

About & Publications

About Us

Staff

Archive

Magazines

Work With Us

Advertise
Jobs
Contact
Terms and Privacy

Newsletters

Get the latest recycling news and analysis delivered to your inbox every week. Stay ahead on industry trends, policy updates, and insights from programs, processors, and innovators.

Subscribe

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • The Latest
  • Analysis
  • Recycling
  • E-Scrap
  • Plastics
  • Policy Now
  • Conferences
    • E-Scrap Conference
    • Plastics Recycling Conference
    • Resource Recycling Conference
    • Textiles Recovery Summit
  • Magazines
  • About Us
  • Advertise
  • Archive
  • Jobs
  • Staff
Subscribe
This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.