Resource Recycling
  • The Latest
  • Analysis
    • All
    • Certification Scorecard
    • Industry Announcements
    • Opinion
    EU flags in front of the European Commission's building.

    Europe’s electronics recovery market is moving upstream

    Maximizing the value of post-consumer PP 

    Maximizing the value of post-consumer PP 

    From claims to custody: PCR procurement grows up

    Certification Scorecard — Week of August 3, 2026

    Microsoft confirms PC sales slump

    Industry announcements for January 2026

    Industry announcements for August 2026

    Data erasure firm expands wearable device capabilities

    What Apple’s latest earnings mean for ITAD

  • Conferences
    • Resource Recycling Conference
    • Plastics Recycling Conference
    • E-Scrap: The Longevity Conference
    • Textiles Recovery Summit
  • Publications
    • E-Scrap News
    • Plastics Recycling Update
    • Policy Now
    • Resource Recycling
    • Other Topics
      • All Topics
      • Brand Owners
      • Critical Minerals
      • Glass
      • Grant Watch / RFPs
      • Markets
      • Organics
      • Packaging
      • Research
      • Technology
      • Textiles
Subscribe
No Result
View All Result
Resource Recycling
  • The Latest
  • Analysis
    • All
    • Certification Scorecard
    • Industry Announcements
    • Opinion
    EU flags in front of the European Commission's building.

    Europe’s electronics recovery market is moving upstream

    Maximizing the value of post-consumer PP 

    Maximizing the value of post-consumer PP 

    From claims to custody: PCR procurement grows up

    Certification Scorecard — Week of August 3, 2026

    Microsoft confirms PC sales slump

    Industry announcements for January 2026

    Industry announcements for August 2026

    Data erasure firm expands wearable device capabilities

    What Apple’s latest earnings mean for ITAD

  • Conferences
    • Resource Recycling Conference
    • Plastics Recycling Conference
    • E-Scrap: The Longevity Conference
    • Textiles Recovery Summit
  • Publications
    • E-Scrap News
    • Plastics Recycling Update
    • Policy Now
    • Resource Recycling
    • Other Topics
      • All Topics
      • Brand Owners
      • Critical Minerals
      • Glass
      • Grant Watch / RFPs
      • Markets
      • Organics
      • Packaging
      • Research
      • Technology
      • Textiles
Subscribe
No Result
View All Result
Resource Recycling
No Result
View All Result
Home E-Scrap

Q&A: Recycling needs heat. Kraftblock offers a solution

Antoinette SmithbyAntoinette Smith
September 6, 2024
in E-Scrap
Q&A: Recycling needs heat. Kraftblock offers a solution

Despite its value in the sustainability sphere, recycling e-scrap is heat- and energy-intensive. Germany-headquartered Kraftblock says the electronics recycling industry needs physical solutions to decarbonize its heat and energy use. 

While several methods of harvesting e-scrap exist, they all require extremely high heat. For example, the pyrometallurgy process maintains temperatures of around 750 to 1,500 degrees Fahrenheit, and lead smelting can be almost as hot, according to Kraftblock, a firm specializing in energy storage. 

E-scrap is the fastest-growing type of discarded material globally, per the World Economic Forum, owing to rapidly changing technology and consumer preferences that make electronics seem disposable. The heat generated by recycling processes also typically emits large amounts of carbon dioxide and other greenhouse gases that can be avoided – including with power generated via captured heat.

Kraftblock’s power-to-heat thermal storage system converts renewable electricity into heat with minimal disruption to existing infrastructure, CEO Martin Schichtel said in a recent interview with E-Scrap News. Kraftblock customizes its technology to provide large-scale, long-duration energy storage, supplying hot air, thermal oil, steam or water at temperatures of up to 2,400 degrees. 

The following Q&A has been edited for clarity and brevity.

What issues does Kraftblock seek to address with your systems?

Our big goal is to cut down on emissions, to decarbonize various heat-intensive industries. So for that reason, we developed a common energy storage platform. In the middle you have a kind of storage which will collect heat connected to various charging and discharging options, and so you can decarbonize, or at least cut down on emissions, via heat processes. It could be waste heat recovered – steel, glass, ceramic produce a lot of waste heat. You can recover it and put it in the storage device, and then discharge to whatever process you need, to directly reduce the emissions in those processes.

It’s hard to picture capturing and storing heat, so is there a layperson-friendly way to describe the process? 

At the moment, I’m on holiday, and so the simplest analogy is to use the sand at the beach. During the day, it’s getting incredibly hot so that you have to use your shoes, right? And that’s the same principle that we use, in a more technical way. Our storage device absorbs the heat. It discharges the heat to this colder environment. We use up to 85% of recycled materials in our storage systems – for example, upcycled steel slag and inorganic waste. So we combine technological benefits with the circular economy.

Why did we select, for example, steel slag – it’s getting generated by the megaton every year for 60-70 years. It’s available worldwide. So there is no issue with the supply chain. It’s a mixture of looking where materials are available and looking to where storage and power is needed, because what we do not want to do is to produce material in Germany and then ship to Australia for an application. 

What is the process of establishing a storage system, starting from when a potential customer first considers implementing it?

So usually first we are asking the customer, what is your process? What is the energy generation? What is the energy generation in the system? What is your goal with this project?

We also ask: What are your thoughts about using such a system? What would you like to improve – is it the footprint, is it a specific temperature? Then when we get the green light, we start a feasibility study by digging more into the details, and how can we integrate it in a very small spot in time so that the production is not standing still for a couple of weeks.

What are the benefits to a client of installing such a system?

I think next month, or a month later, we will publish a project with one of the largest steel manufacturers in the world where we install a waste heat recovery system. And this waste heat recovery system reduces gas consumption, reduces another 20,000 tons of carbon dioxide, which is a brilliant effect already. It also increases the efficiency in such a plant, which means each ton that’s getting produced has a lower carbon dioxide footprint, has a better energy efficiency, and the whole sector will be strengthened as well.

That’s the beauty of this storage system, you can always use electricity to the maximum, cheapest price of the market. You even improve the safety on site, because if you do not have to handle gas, there’s nothing which can explode. Also in terms of insulation, it’s that well-insulated that it never gets hotter than 50 degrees Celsius on the outer shell, which is much lower than typical process you see in those industries.

You can also distribute excess energy generated from the recovered waste heat, out into the grid?

Yes, yes, you have multiple functions – you can use the heat for process. If you talk about waste recovery, you can use heat for the same process. If you talk electrification, it’s exactly the same. But you can also decide to deliver heat to another process: could be a district heating system, could be the third-party customer outside your own plant. Because if we think about plastics recycling or about rubber tires, or pyrolizers, they have enough heat so they can use the power and they can sell the rest of the waste heat to another company from the same location, be it a strategic system, could be a utility, so you can use the heat multiple times.

But that could also be done, for example, for e-waste recycling. So they have high temperatures, 1,200 degrees Celsius, sometimes even higher, which means they do have waste heat at that temperature potential. You harvest that waste heat, then put it into your storage device.

So would you say that most of the systems are custom, or are there a lot of similarities between companies and industries?

Storage is always the same. The infrastructure for charges and discharges is a bit different, but most of the parts, again, are the same. So we de-risk the product that way for the customer and standardize it with each application. Our storage is based on 20-foot storage containers, the same for liquid. If we need higher storage capacity, then we put two, four, 10, 20 of those containers to go to larger storage capacity. So it is a bit tailored.

What would be a typical time frame from start to finish?

On average, from the very first analysis of the data till the installation usually the time frame is between six months for a small system and 12-18 months for a large system. It depends a little bit on the location. It depends on the time it takes to file building permits, to get that storage integrated into the existing site. There are a couple of regulations we have to check as well, and usually, in our experience, filing permits takes more time than building the whole system itself. If everything is on stock in our location, storage can be built within three months and delivered in three months. For most of the components there are multiple suppliers in the market.

TweetShare
Antoinette Smith

Antoinette Smith

Antoinette Smith has covered commodity plastics and supply chains for more than a decade, with a special focus on economic impacts and consumer behavior. She brings a balanced, thoughtful view to recycling stories, and isn't afraid to ask "why?" Contact Antoinette at antoinette@resource-recycling.com.

Related Posts

Appealing to next-gen ITAD workers means extending beyond equipment

Appealing to next-gen ITAD workers means extending beyond equipment

byPaul Lane
August 6, 2026

ndustry insiders say attracting new talent will require educating would-be employees about the benefits and skills needed in the field.

A Republic Services truck picks up a recycling cart in Fort Collins, Colorado.

Fort Collins, CO builds a roadmap to zero waste

byKeith Loria
August 6, 2026

The midsize city has big ambitions on waste reduction and is working with partners to advance its goals.

New federal rule restricts black mass, tungsten scrap exports

byStefanie Valentic
August 5, 2026

A new BIS rule requires US sellers of black mass and tungsten scrap to allocate 100% of monthly sales domestically...

Summing up California container deposit changes

Connecticut’s container redemption rate soars 27%

byStefanie Valentic
August 5, 2026

Connecticut's redemption rate jumped 27% in a year, while most other deposit states remained flat.

EU flags in front of the European Commission's building.

Europe’s electronics recovery market is moving upstream

byDavid Daoud
August 5, 2026

Data center growth, EU product rules and new capital models are changing who controls retired electronics.

Mineral shortage creates ITAD opportunity

Mineral shortage creates ITAD opportunity

byPaul Lane
August 5, 2026

Industry leaders speaking at the ITAD Summit said companies can create their own space in the market by capitalizing upon...

Load More
Next Post
Metals market fluctuations filter down to e-scrap sector

Metals market fluctuations filter down to e-scrap sector

2026 Buyers’ Guide

Equipment, services and technology suppliers serving the recycling industry.

Browse the Guide

More Posts

2024 legislatures focus on batteries, state programs

NAW sues Colorado over EPR packaging law

July 30, 2026

New federal rule restricts black mass, tungsten scrap exports

August 5, 2026
The most important decision in tire recycling happens before the shredder

Oregon wash hub looks to slash single-use plastic

August 4, 2026
tires

The most important decision in tire recycling happens before the shredder

August 3, 2026
Data shows need for recycling label clarity

Data shows need for recycling label clarity

July 31, 2026
CarbonLite to open $60 million Pennsylvania plant

Federal judge blocks CA ‘Truth in Recycling’ (SB 343) law

July 15, 2026

The first E-scrap franchisor finds treasure in trash

August 3, 2026
Plastic packaging samples arranged on a table.

What producers got wrong about SB 54’s 25% target

August 3, 2026
The White House in Washington, D.C.

Presidential order empowers feds to block mineral exports

July 31, 2026
Industry announcements for January 2026

Industry announcements for August 2026

August 3, 2026
Load More

About & Publications

About Us

Staff

Archive

Magazine

Work With Us

Advertise
Jobs
Contact
Terms and Privacy

Newsletter

Get the latest recycling news and analysis delivered to your inbox every week. Stay ahead on industry trends, policy updates, and insights from programs, processors, and innovators.

Subscribe

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • The Latest
  • Analysis
  • Recycling
  • E-Scrap
  • Plastics
  • Policy Now
  • Conferences
    • E-Scrap Conference
    • Plastics Recycling Conference
    • Resource Recycling Conference
    • Textiles Recovery Summit
  • Magazine
  • About Us
  • Advertise
  • Archive
  • Jobs
  • Staff
Subscribe
This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.